FREE SHIPPING ON ORDERS OVER $99

The Diesel Outlet
GTIN 671875111933 SKU: DDP.AENEW Categories: , Tag:

Dynomite Diesel Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector

$380.00

Out of stock

Out of stock

Social Share:

Description

Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.

Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what’s known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Additional information

Weight 8.8 lbs
Dimensions 12.5 × 10.5 × 10.5 in
GTIN

671875111933

identifier_exists

Yes

google_product_category

2727

Reviews

There are no reviews yet.

Be the first to review “Dynomite Diesel Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector”

Your email address will not be published. Required fields are marked *

Related Products