FREE SHIPPING ON ORDERS OVER $99

The Diesel Outlet
GTIN 671875111957 SKU: DDP.AE-1 Categories: , Tag:

Dynomite Diesel Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over

$3,616.33

Out of stock

Out of stock

Social Share:

Description

Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8. New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles. Approximately 50 RWHP over stock. Safe on stock trucks. Excellent for towing applications.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-1

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Additional information

Weight 27 lbs
Dimensions 12 × 17 × 9 in
GTIN

671875111957

identifier_exists

Yes

google_product_category

2727

Reviews

There are no reviews yet.

Be the first to review “Dynomite Diesel Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over”

Your email address will not be published. Required fields are marked *

Related Products