FREE SHIPPING ON ORDERS OVER $99

The Diesel Outlet
GTIN 671875112015 SKU: DDP.AE-2 Category: Tag:

Dynomite Diesel Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over

$3,616.33

0 in stock

0 in stock

Quantity

Social Share:

Description

Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 2 injector set that’s been fully balanced with 140cc injector bodies and 25 percent over nozzles. Comes with long lead injector for cylinder #8.

Approximately 75-100 RWHP gains over stock with proper supporting modifications. Great for a hot street truck with light duty towing. Turbo upgrade mandatory if towing frequently or heavy.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-2

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Additional information

Weight 8.8 lbs
Dimensions 12.5 × 10.5 × 10.5 in
Brand

Dynomite

Google Product Category

2727

MPN

DDP.AE-2

identifier_exists

Yes

google_product_category

2727

GTIN

671875112015

Reviews

There are no reviews yet.

Be the first to review “Dynomite Diesel Ford 99-03 7.3L Stage 2 LONG LEAD Injector Set 25 Percent Over”

Your email address will not be published. Required fields are marked *

Related Products